East Wenatchee Water District
455 6th St. NE
East Wenatchee, WA 98802
509-884-3569
Contact via E-mail
Open 7:00am - 5:30pm Monday - Thursday :: Closed Fridays

Rates

Billing will be sent to all customers on the 15th of each month.

  Adopted
2025 2026 2027 2028
Monthly Base Rate (A)
Meter Size        
5/8" Meter $44.00 $45.00 $46.00 $47.00
1" Meter $49.00 $50.00 $51.00 $52.00
1-1/2" Meter $58.00 $60.00 $61.00 $62.00
2" Meter $73.00 $75.00 $77.00 $79.00
3" Meter $197.00 $203.00 $209.00 $215.00
4" Meter $242.00 $249.00 $256.00 $263.00
6" Meter $818.00 $833.00 $857.00 $882.00
8" Meter $1,261.00 $1,284.00 $1,322.00 $1,361.00

 

Monthly Base Rate for Private Fire Lines
Meter Size 2025 2026 2027 2028
Devices Up to 8" $105.00 $110.00 $113.00 $116.00
Devices Larger Than 8" $165.00 $170.00 $175.00 $180.00

 

Consumption Rates per ccf
Connection Type 2025 2026 2027 2028
Single-Family        
Up to 6 ccf Monthly $2.10 $2.20 $2.30 $2.40
Over 6 ccf Monthly $2.80 $2.90 $3.00 $3.10
Multi-Family $3.90 $4.00 $4.10 $4.20
Commercial $3.90 $4.00 $4.10 $4.20
Industrial $3.90 $4.00 $4.10 $4.20
Irrigation & Other Metered Water Uses $5.40 $5.60 $5.80 $6.00

 

Residential Plant Investment Fee

Monthly base rate will begin as soon as the meter is installed. (A)

Meter Size 2025 2026 2027 2028
5/8" Meter $6,000.00 $6,200.00 $6,400.00 $6,600.00
1" Meter $9,900.00 $10,200.00 $10,500.00 $10,800.00

 

Plant Investment Fee -- All Non-Residential Meters (1)

Add (1) Plant Investment Fee + (2) Fire Connection Charge + (3) Meter Installation Charge for total cost.

Meter Size 2025 2026 2027 2028
5/8" Meter $3,700 $3,800 $3,900 $4,000
1" Meter $7,400 $7,600 $7,800 $8,000
1-1/2" Meter $18,500 $19,100 $19,700 $20,300
2" Meter $29,700 $30,600 $31,500 $32,400
3" Meter $59,400 $61,200 $63,000 $64,900
4" Meter $92,800 $95,600 $98,500 $101,500
6" Meter $185,600 $191,200 $196,900 $202,800
8" Meter $296,900 $305,800 $315,000 $324,500
10" Meter $426,900 $439,700 $452,900 $466,500
12" Meter $556,800 $573,500 $590,700 $608,400

 

Fire Connection Charge (2)
Connection Type 2025 2026 2027 2028
Single-Family $1,800 $1,900 $2,000 $2,100
Multi-Family/Commercial $2,700 $2,800 $2,900 $3,000
Irrigation N/A N/A N/A N/A

 

Meter Installation Charge (3)
Meter Size 2025 2026 2027 2028
5/8" Residential Meter $500 $500 $500 $500
1" Residential Meter $700 $700 $700 $700
Non-Residential Meter (Any Size) Cost of Materials (Plus 20% Markup), Labor and Equipment

 

Private Fire Line Connection Charge
Device Size 2025 2026 2027 2028
Devices Up to 8" $9,800 $10,100 $10,400 $10,700
Devices Larger Than 8" $16,300 $16,800 $17,300 $17,800

 

Top of Page